Etah, UP • M30 Concrete • 711m Road Stretch

Port 9000 Live | 12:00:00
Total Concrete Yield 0.00 m³ 0 batches logged
Cement Consumed 0 bags Standard 50kg bags
Road Length Completed 0.00 m 3.5m half-width section
Total Production Cost ₹0 Materials + Contractor Casting
Average Unit Cost ₹0/m³ Cost per cubic metre
Overall Road Construction Progress 0% Complete (0m / 711m)

⚡ Batch Production Logger

Cement Bags 0.00 bags
Normalized Mix Ratio 1 : 0.00 : 0.00
W/C Ratio 0.000
Raw Material Cost ₹0
Contractor Casting Cost ₹0
Total Unit Cost ₹0/m³

📅 Batches Cast on Selected Date

Live chronological site ledger
Batch No Time Concrete Yield Cement Bags Normalized Mix Ratio Unit Cost / m³

📋 Complete Production Register

📥 Export All Batches (CSV)
Date Batch Yield (m³) Cement Sand Aggregate Water Mix Ratio W/C Material Cost Cost / m³ Status Action

📦 Dual-Track Cement Stock Management

📥 Export Inventory (CSV)
Date Opening Ledger Received (+) Consumed (-) Closing Ledger Physical Count Stock Variance Remarks

🛣️ Road Progress & Chainage Tracking

Half-width 3.5m • Thickness 0.25m • Factor: 0.875 m³/running metre
Date Batches Concrete Cast Theoretical Length Actual Measured Length (m) Chainage Reference Variance (Actual - Theo) Remarks

Daily Concrete Production (m³) & Batches

Material Consumption Trend

Production Cost Breakdown (Material vs Casting)

Water / Cement Ratio Quality Trend

⚙️ Material Procurement Rates & Road Specifications

Used for all real-time cost and volume calculations

Material Procurement Working Rates

Road Geometry & Project Specifications